What should an office IT setup plan include before fit-out begins?
Plan connectivity, cabling, Wi-Fi, workstations, meeting rooms, identity, security and support before fit-out closes access to ceilings and walls. Use a floor plan and business requirements so physical work and technology choices support each other.
Start with how the office will operate
Identify desk locations, meeting spaces, visitors, specialist equipment and growth expectations. Note applications that depend on reliable connectivity. These details affect network capacity, power, cable routes and equipment placement.
Coordinate the physical work
Agree rack locations, ventilation, power protection, cable pathways and labelling with the fit-out team. Check the requirements of the building and the relevant service providers. Changes are usually easier to accommodate before installation is complete.
Design access and support
Separate staff, guest and operational device access where appropriate. Define device onboarding, user permissions and the process for reporting faults. A new office needs an operating model as well as installed hardware.
Write acceptance tests
Test wired connections, wireless coverage, meeting-room calls, printing and access to essential applications. Verify the diagrams and asset list against the installed environment. Collect warranty and support details before handover.
For a relocation, include internet lead times, address changes and a contingency for delayed services. The move date should not be the first time the new setup is tested with real business work.